Undecided
This application is awaiting a decision from the council.
T1 Holm Oak - Reduce the primary branch above the BT lines on the western side of the canopy by approximately 2 metres to suitable pruning points. - Reduce the foliage on the secondary branch adjacent to and above the BT lines by approximately 1–1.5 metres. - Reduce the remaining western canopy branch by approximately 1–2 metres bringing the western side back into the inner crown. - Crown lift to approximately 3.5 metres by removing or reducing secondary and tertiary branches only. - On the northern side reduce the lowest branch back into the inner crown by approximately 2 metres. - Continue the reduction around the northern and upper crown reducing selected branches by approximately 1–2 metres to bring the canopy back in line with the inner crown. - On the eastern side reduce selected branches by up to 1 metre to refine the crown. - Carry this shaping through the upper crown reducing the top of the crown by up to 1 metre.
06 August 2026
14 August 2026
14 August 2026
BH19 2DL
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with Dorset Council. External links open in a new tab.
Toggle on to get notified when P/TRT/2026/04273 changes status.
Dorset Council
DST
unknown portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.