Recorded as undecided
Recorded source status: Undecided. This is a recorded snapshot, not a current-status guarantee.
Last source check: 14 August 2026. This record has not been checked recently; its status and consultation details may have changed. Check the responsible authority's published record.
No published public consultation end date is recorded. Check the official record for eligibility, publicity dates and whether comments are being accepted. We do not estimate a deadline from the received date.
T1 Holm Oak - Reduce the primary branch above the BT lines on the western side of the canopy by approximately 2 metres to suitable pruning points. - Reduce the foliage on the secondary branch adjacent to and above the BT lines by approximately 1–1.5 metres. - Reduce the remaining western canopy branch by approximately 1–2 metres bringing the western side back into the inner crown. - Crown lift to approximately 3.5 metres by removing or reducing secondary and tertiary branches only. - On the northern side reduce the lowest branch back into the inner crown by approximately 2 metres. - Continue the reduction around the northern and upper crown reducing selected branches by approximately 1–2 metres to bring the canopy back in line with the inner crown. - On the eastern side reduce selected branches by up to 1 metre to refine the crown. - Carry this shaping through the upper crown reducing the top of the crown by up to 1 metre.
06 August 2026
14 August 2026
14 August 2026
BH19 2DL
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open recorded data source (PlanIt)Check public commenting on council portalFind the application on the council portal
Use the available source or council register link above. A register fallback may require you to search for the application reference.
Check whether public comments are accepted
Application types and public commenting eligibility vary. Follow the council's published instructions, including any registration and personal-information requirements.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
Use the published public consultation deadline on the official record. Do not calculate it from the received date or substitute a statutory-consultee date. Ask the council if the deadline or eligibility is unclear.
💡 Tip: A recorded undecided status does not mean comments are accepted. Check the council's current record and meeting rules before taking part.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with Dorset Council. External links open in a new tab.
Choose a postcode and radius in your alert settings. Area alerts depend on available source coverage and checks; this does not activate monitoring for this individual application.
Open alert setupDorset Council
DST
unknown portal
to save applications
Share the recorded details and encourage neighbours to check the current official record.
to add private notes
Community discussion here is not a representation to the council. Use the official record to check public commenting instructions.
to join the discussion
No comments yet. Be the first to share your thoughts.