Recorded as undecided
Recorded source status: Undecided. This is a recorded snapshot, not a current-status guarantee.
Last source check: 18 August 2026. This record has not been checked recently; its status and consultation details may have changed. Check the responsible authority's published record.
Recorded public consultation end date: 7 September 2026. This recorded date has passed. Dates and eligibility can change; check the official record for the current public deadline and whether comments are accepted. A recorded status or future date does not establish commenting eligibility.
Approval of details pursuant to Condition 10 (Site Waste Management Plan), Condition 12 (Air Quality), Condition 14 (Noise Assessment), Condition 21 (Surface Water Drainage Details), Condition 31 (Fabric Energy Efficiency Standards (FEES)), Condition 32 (Green Infrastructure), Condition 38 (Car Parking and Design Management Plan), Condition 39 (Car Parking Permits), Condition 40 (Car Club), Condition 41 (Electric Charging Point Provision), Condition 45 (Delivery and Servicing Strategy), Condition 46 (Cycle Parking Provision), Condition 47 (Sound Insulation and Internal Noise Levels), Condition 51 (Wind), Condition 56 (Arboricultural Report) and Condition 57 (Flood Resilience) relating to Phase 2A only attached to Planning Consent 21/00574/OUT (LLDC) dated 18th September 2023.
7 September 2026
17 August 2026
18 August 2026
E15 2RU
Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.
Open council-hosted application recordCheck public commenting on council portalFind the application on the council portal
Use the available source or council register link above. A register fallback may require you to search for the application reference.
Check whether public comments are accepted
Application types and public commenting eligibility vary. Follow the council's published instructions, including any registration and personal-information requirements.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
Use the published public consultation deadline on the official record. Do not calculate it from the received date or substitute a statutory-consultee date. Ask the council if the deadline or eligibility is unclear.
💡 Tip: A recorded undecided status does not mean comments are accepted. Check the council's current record and meeting rules before taking part.
First tracked by Planning Alerts
Recorded public consultation end date
Verify current public deadline and eligibility on the official record
Documents remain with London Borough of Newham. External links open in a new tab.
Choose a postcode and radius in your alert settings. Area alerts depend on available source coverage and checks; this does not activate monitoring for this individual application.
Open alert setupLondon Borough of Newham
NWM
idox portal
to save applications
Share the recorded details and encourage neighbours to check the current official record.
to add private notes
Community discussion here is not a representation to the council. Use the official record to check public commenting instructions.
to join the discussion
No comments yet. Be the first to share your thoughts.