Undecided
This application is awaiting a decision from the council.
Consultation period ended 13 days ago
The standard 21-day consultation window has passed. Late comments may still be accepted at the council's discretion.
Refurbishment, repair and alteration works to Merton House and Merton Cottage, including thermal performance upgrades, repair and replacement of roof coverings, associated roof structures, installation of internal wall, floor and roof insulation, repair, refurbishment and selective replacement of windows including secondary and vacuum glazing, replacement of rainwater goods, internal reconfiguration and upgrading of accommodation, damp remediation, structural repairs and underpinning works. Removal of later additions and alterations, demolition and reconstruction of the coach house, stores and associated boundary wall using salvaged materials, demolition of various outbuildings, reconfiguration of access arrangements including formation of an accessible entrance to Merton House, rebuilding and reskinning of the 1960s extension at Merton House, installation of air source heat pump enclosure at Merton Cottage, associated repair, conservation and ancillary works, and works within the regi
21 August 2026
31 August 2026
04 September 2026
CB3 0AD
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Documents remain with Cambridge City Council. External links open in a new tab.
Toggle on to get notified when 26/03182/LBC changes status.
Cambridge City Council
CAB
unknown portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.