Undecided
This application is awaiting a decision from the council.
Consultation period ended 7 days ago
The standard 21-day consultation window has passed. Late comments may still be accepted at the council's discretion.
Certificate of Lawfulness for proposed installation of a comprehensive renewable energy system consisting of roof-mounted solar photovoltaic (PV) arrays on the East and West pitched roof elevations, a vertically mounted solar PV array on the South elevation wall, a battery energy storage system, and an air-to-air heat pump/air conditioning condenser unit mounted to the external South elevation wall. Together, these technologies will form an integrated low-carbon energy system designed to maximise the generation, storage and efficient use of renewable electricity within the property.
27 August 2026
31 August 2026
04 September 2026
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with Crawley Borough Council. External links open in a new tab.
Toggle on to get notified when CR/2026/0422/192 changes status.
Crawley Borough Council
CRW
bespoke portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.