Undecided
This application is awaiting a decision from the council.
Consultation period ended 13 days ago
The standard 21-day consultation window has passed. Late comments may still be accepted at the council's discretion.
Four Yew trees at the rear of the property along the western boundary adjacent to a private lane, as indicated in the attached report. As per recommendations made by the arboriculturist in his report, prune low branches of T1, T2 and T3, by removal of lower growth up to a height of approximately 3m from ground level (ground level being taken as top of the bank where trees are rooted). This will target both tertiary and secondary branches. The fourth tree (T4) in the group is to have lower branches retained from approximately 50cm to 1.5m from ground level (ground level being taken as top of the bank where trees are rooted). These branches are forming a small natural boundary hedge that shields neighbouring property’s private road. Prune branches above the height of the lower retained section to create a window of daylight by pruning secondary and tertiary branches to a height of approximately 3m from ground level (ground level- taken from root zone area). This will remove x1 low branch
21 August 2026
31 August 2026
04 September 2026
OX10 0RH
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with South Oxfordshire District Council. External links open in a new tab.
Toggle on to get notified when P26/S3695/TCA changes status.
South Oxfordshire District Council
SOX
unknown portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.