Undecided
This application is awaiting a decision from the council.
Consultation period ended 14 days ago
The standard 21-day consultation window has passed. Late comments may still be accepted at the council's discretion.
The use of the land and buildings edged red on the submitted plans as a single dwellinghouse (Use Class C3), occupied and used separately from, and otherwise than in connection with or ancillary to, the occupation and use of 56A North Street.A certificate is sought in respect of the following: 1. Use as a single dwellinghouse. The two-storey cottage known as 56b North Street, Thame (also known as The Barn) has been used as a single self-contained dwellinghouse, occupied as a sole and principal residence independently of 56A North Street and 56 North Street, since approximately 2012. The dwelling comprises, at ground floor level, an open-plan living area, kitchen, bathroom and staircase; and at first floor level, two bedrooms, a landing and a WC. 2. Ancillary store and garden. The store room adjoining the dwelling has been used for domestic storage ancillary to that residential use. The enclosed garden has been used as private amenity space in connection with that residential use. Neith
20 August 2026
31 August 2026
04 September 2026
OX9 3BH
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with South Oxfordshire District Council. External links open in a new tab.
Toggle on to get notified when P26/S3653/LDE changes status.
South Oxfordshire District Council
SOX
unknown portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.