Undecided
This application is awaiting a decision from the council.
Consultation period ended 1 day ago
The standard 21-day consultation window has passed. Late comments may still be accepted at the council's discretion.
(T1) Oak Reduce the height and overall crown spread by approximately 2–3 metres, with selective crown rebalancing to restore a more even and balanced structure. A large limb has previously failed from the tree, causing significant damage to the garages below and leaving the remaining crown noticeably unbalanced. The proposed reduction will help to restore balance, reduce excessive end weight and assist in maintaining the tree’s long-term health and structural stability. There is also a large limb extending over the new garages which contains a significant cavity. Due to its position directly above the garage roofs, it is recommended that this limb is removed back to the main trunk to eliminate the immediate risk of further limb failure and potential damage to the buildings below. Remove major deadwood throughout the crown where appropriate to reduce the risk of falling branches and improve overall safety.
02 September 2026
03 September 2026
09 September 2026
Data source: Salesforce-hosted council register. The council register destination is shown separately from this data-source label.
Open original application recordOpen council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with London Borough of Haringey. External links open in a new tab.
Toggle on to get notified when HGY/2026/2449 changes status.
London Borough of Haringey
HRY
salesforce portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.