Recorded as undecided
Recorded source status: Undecided. This is a recorded snapshot, not a current-status guarantee.
Last source check: 4 September 2026. This record has not been checked recently; its status and consultation details may have changed. Check the responsible authority's published record.
No published public consultation end date is recorded. Check the official record for eligibility, publicity dates and whether comments are being accepted. We do not estimate a deadline from the received date.
T1 Beech (2 limbs)- Reduce the identified eastern lateral limb over Church Lane by apporx 6 metres, leaving a final length of approximately 8m,removing the overhang of the road and footway. Following a recent limb failure (after the report was written), it is suggested that a limb overhanging the road, is also reduced by approximately 3.5m, leaving a final length of approximately 8m. T2 Sycamore (tag 1791)- Reduce to an 8m monolith above the stem cavity, retaining the standing stem as habitat. T4 Lime (tag 1789) -Reduce the crown by approx 2m, so that the final crown spread is approximately 6m and the height is approx. 14m G1 - crown lift, overhanging public foothpath and road so that the final height is 2.5m over the path and 6m over the road to give clear pedestrian and vehicular access.
02 September 2026
03 September 2026
04 September 2026
WD25 8BE
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open recorded data source (PlanIt)Check public commenting on council portalFind the application on the council portal
Use the available source or council register link above. A register fallback may require you to search for the application reference.
Check whether public comments are accepted
Application types and public commenting eligibility vary. Follow the council's published instructions, including any registration and personal-information requirements.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
Use the published public consultation deadline on the official record. Do not calculate it from the received date or substitute a statutory-consultee date. Ask the council if the deadline or eligibility is unclear.
💡 Tip: A recorded undecided status does not mean comments are accepted. Check the council's current record and meeting rules before taking part.
Application received by council
First tracked by Planning Alerts
Documents remain with Hertsmere Borough Council. External links open in a new tab.
Choose a postcode and radius in your alert settings. Area alerts depend on available source coverage and checks; this does not activate monitoring for this individual application.
Open alert setupHertsmere Borough Council
HER
bespoke portal
to save applications
Share the recorded details and encourage neighbours to check the current official record.
to add private notes
Community discussion here is not a representation to the council. Use the official record to check public commenting instructions.
to join the discussion
No comments yet. Be the first to share your thoughts.