Undecided
This application is awaiting a decision from the council.
Consultation period ended 1 day ago
The standard 21-day consultation window has passed. Late comments may still be accepted at the council's discretion.
T1 Weeping Willow - Re-Pollard – Remove all secondary growth back to the previously established pollard points on the main scaffold limbs. G2 Crack Willow – Multi-stemmed tree comprising three primary stems - Re-Pollard – Remove all secondary growth back to the previously established pollard points on the main scaffold limbs. G3 Holly x2 - Re-Pollard – Remove all secondary growth back to the previously established pollard points on the main scaffold limbs. T4 London Plane - Pollard – Pollard the tree at a height of approximately 8 metres above ground level, making suitable finishing cuts to the primary and secondary scaffold limbs to establish a framework from which the tree can be managed as a pollard over the long term. Additionally, remove the two lowest secondary scaffold limbs back to the main stem to provide suitable clearance above the Yew archway. G5 Holly x2 - Fell to ground level in a safe and controlled manner. T7 English oak - Fell to ground level in a safe and controlled m
02 September 2026
04 September 2026
04 September 2026
OX10 0HD
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with South Oxfordshire District Council. External links open in a new tab.
Toggle on to get notified when P26/S3837/TCA changes status.
South Oxfordshire District Council
SOX
unknown portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.