Undecided
This application is awaiting a decision from the council.
⚠️ Last day to comment — deadline is today
Estimated deadline (21 days): 25 September 2026
T1 - sweet gum tree (6m) - take down to ground level. T2 - acer tree (4m) - reduce lowest limb overhanging patio by approximately 2m to suitable pruning points close to edge of patio. T3 - thorny olive tree (4m) - take down to ground level. T4 - laurel tree (3m) - reduce height to approximately fence height (1.8m) and reduce branches back from bed by approximately 1m. T5 - climbing hydrangea (3m) - reduce height to approximately fence height (1.8m). T6 - ivy on right fence (3m) - remove as much as possible around hydrangea. T7 - ivy on rear fence (3m) - remove as much as possible from top of fence to allow plants beneath space. T8 - winter jasmine & euonymus bushes (2m) - cut back from path. Front garden- T9 - variegated laurel tree (3m) - reduce height to approximately 2.2m and reduce back from driveway. T10 - variegated euonymus hedge (1m) - cut back to wall from pavement and remove branch from rear plant growing wall, leaving acer above.
04 September 2026
05 September 2026
11 September 2026
Data source: Salesforce-hosted council register. The council register destination is shown separately from this data-source label.
Open original application recordOpen council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with London Borough of Haringey. External links open in a new tab.
Toggle on to get notified when HGY/2026/2475 changes status.
London Borough of Haringey
HRY
salesforce portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.