Undecided
This application is awaiting a decision from the council.
Application to determine if prior approval is required for a proposed: Change of Use of Agricultural Buildings to a flexible use within General Industrial (Class B2), Storage or Distribution (Class B8), Hotels (Class C1), Commercial/Business/Service (Class E), Outdoor Sport or Recreation (Class F2(c)), or for the provision of agricultural training. 1 x The dairy building. 205.1m². A typical farm construction of steel frame, concrete block and corrugated cement cladding and roof. A building which housed the milking operation of the dairy farm for more than 40 years. The building consists of the ground floor milking parlour 68m² with a first floor feed loft above 68m², bulk milk tank room 22.5m² and plant room 46.6m² to be converted to Class E(g)(i) (Commercial, Business and Service - Offices) 1 x Agricultural barn. 272m². Typical barn construction of concrete portal frame, corrugated cement roof and partial cladding, concrete floor with partial concrete walls. Doors at one end. To be converted to Class B8 (Storage or Distribution).
04 August 2026
07 August 2026
RG7 3AH
Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.
Open original application recordComment on this applicationFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
First tracked by Planning Alerts
Documents remain with West Berkshire Council. External links open in a new tab.
Toggle on to get notified when 26/01673/PACOU changes status.
West Berkshire Council
WBK
idox portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.