Undecided
This application is awaiting a decision from the council.
Section 211 Notice under the Town and Country Planning Act 1990 to crown reduce and reshape to produce a smaller, balanced crown, Cherry tree (T1); Reduce crown back to previous established pruning points and reshape accordingly. Crown lift to provide approximately 1.8 m (6 ft) clearance above ground level, Canadian Maple (T2); Reduce overall crown by approx 50% and reduce lateral spread by approx 0.3-0.6 m (1-2 ft), establishing new pruning points for future routine maintenance. Retain and reshape remaining crown, Bay tree (T3); Prune and reshape crown, including removal or reduction of overhanging branches, Plum tree (T4); Crown reduce and reshape to control overall size, retaining a balanced and natural form. Cut back branches and growth overhang to clear pathway, Olive tree (T5); Crown reduce and reshape to control overall height and spread whilst retaining a balanced form. Remove or reduce branches overhanging roof of the main house, Holly tree (T6); Reduce the overall crown by approximately 50% and reshape. Remove selected rear stems and growth extending towards or against flint boundary wall, Bay tree (T7); Crown reduce by approx 1.2-1.5 m (4-5 ft), reducing crown to retain a balanced and natural form, Sweet Chestnut (T8); in the Durrington Conservation Area.
18 September 2026
23 September 2026
Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.
Open original application recordComment on this applicationFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
First tracked by Planning Alerts
Documents remain with Adur District Council. External links open in a new tab.
Toggle on to get notified when AWDM/1100/26 changes status.
Adur District Council
ADU
idox portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.