Undecided
This application is awaiting a decision from the council.
T1 Laurel (Prunus laurocerasus)reduce the overall crown by approximately 1m, T2 Laurel (Prunus laurocerasus) reduce the overall crown by approximately 1m and reshape, T3 Fig (Ficus carica): Prune back the lateral branch extending across the doorway by approximately 2.5m to provide suitable clearance, T4 Yew (Taxus baccata) Prune back lateral growth extending over the pathway adjacent to the bridge to provide suitable clearance, T5 Hawthorn (Crataegus monogyna) Fell to as close to ground level as practicable, T6 Lime (Tilia spp.) Crown raise to approximately 5m above ground level, removing or shortening lower branches as appropriate to provide clearance, T7 Goat Willow (Salix caprea) Fell to as close to ground level as practicable,Treat remaining stump with eco-plugs to prevent regrowth, T8 Yew (Taxus baccata) Prune back growth extending towards and over the shed roof to provide suitable clearance, Reduce and reshape the crown to a final height of approximately 4m, T9 Sycamore (Acer pseudoplatanus) Reduce the overall crown by approximately 4m,T10 Rowan (Sorbus aucuparia)Prune branches as necessary to provide suitable clearance around the cables, Reduce and reshape the crown to a final height of approximately 6m, T11 Lime (Tilia spp.) Re-pollard to the previous pollard/reduction points.
22 September 2026
23 September 2026
Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.
Open original application recordComment on this applicationFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
First tracked by Planning Alerts
Documents remain with Canterbury City Council. External links open in a new tab.
Toggle on to get notified when CA/26/01562 changes status.
Canterbury City Council
CAT
idox portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.