26/01500/CANRegistered

The Reigate Beaumont Colley Lane Reigate Surrey RH2 9JB

Undecided

This application is awaiting a decision from the council.

Proposal

Apple (T7) - Fell to ground level. Extensive decay to base. Risk of failure. High target area due to proximity to building. Apple (T8) - Fell to ground level. Extensive decay to base. Risk of failure. High target area due to proximity to building. Apple (T9) - Fell to ground level. Extensive decay to base. Risk of failure. High target area due to proximity to building. Cherry (T10) - Fell to ground level. Extensive dieback of crown. High target area. Scots pine (T13) - Crown reduce by 1.5 metres in height and spread on all aspects, leaving a finished height of 17 metres and crown spread of 3 metres on all aspects. Pruning cuts to be made back to a suitable branch junction and no larger than 30% of the diameter of the parent branch. Tree has historically lost central stem and the sub-dominant stem has now taken over as the leader, but is growing at a 45 degree angle. Excessive loading on the main union, which has started to decay due to the dead remnant of the old leading stem. High target area. Scots pine (T14) - Sectionally dismantle down to ground level. Snapped and hanging limbs which make up just under 50% of the total crown. The remainder of the crown is a co-dominant stem, which is heavily leaning to the south and there is extensive topside decay on the stem, near the main union. The stem overhangs the road and is at high risk of failure. Cypress (T26) - Reduce weight of lower limb extending over lawn, adjacent to footpath. Pruning cuts to be made back to a suitable branch junction and no larger than 30% of the diameter of the parent branch. Hazard beam (longitudinal split) on limb near main stem. Poplar (T27) - Reduce end weight of lowest limb extending to the west by 2 metres, leaving a finished limb length of 6 metres. Pruning cuts to be made back to a suitable branch junction and no larger than 30% of the diameter of the parent branch. Lowest limb is overextended and at risk of snapping. Beech (T31) - Sectionally dismantle down to ground level. Open cavity

First tracked

23 September 2026

Last checked

23 September 2026

Source & Council Register

Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.

Open original application recordComment on this application

How to Comment on This Application

1

Find the application on the council portal

Use the "View original on council portal" button above to open the official planning register entry for this application.

2

Click "Make a Comment" or "Comment on this application"

Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.

3

Write a material planning consideration

Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.

4

Submit before the consultation deadline

The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.

💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.

Comment on this application →

Application Timeline

Loading history…
  1. First tracked by Planning Alerts

Documents & Plans

Updated 21 hours ago
Loading documents from council portal…

Documents remain with Reigate and Banstead Borough Council. External links open in a new tab.

Status alerts

Toggle on to get notified when 26/01500/CAN changes status.

Council

Reigate and Banstead Borough Council

REI

idox portal

Save for Later

to save applications

Share

Share with Neighbours

Let your neighbours know about this application before the consultation deadline.

My Notes

to add private notes

Community Discussion

to join the discussion

No comments yet. Be the first to share your thoughts.

Data Sources & Attribution

Official UK government planning data platform. Planning applications, listed buildings, conservation areas, flood risk zones, and more.

PlanIt.org.ukRights review

UK planning applications aggregator covering 420 local authorities. Used as a fallback data source for councils not yet on the official feed.

Planning application information accessed from council portals. Individual councils and portal providers may have separate reuse terms.

Listed buildings and scheduled monuments data via PlanningData.gov.uk.

Planning Alerts combines Planning Data records with information from council portals and other sources. Planning Data-sourced records are used under Open Government Licence v3.0 attribution. Other sources may have separate terms and are not enabled for commercial API, export, paid-alert or professional workflows until their rights are verified.