Recorded as undecided
Recorded source status: Pending Consideration. This is a recorded snapshot, not a current-status guarantee.
Last source check: 8 October 2026. This record has not been checked recently; its status and consultation details may have changed. Check the responsible authority's published record.
No published public consultation end date is recorded. Check the official record for eligibility, publicity dates and whether comments are being accepted. We do not estimate a deadline from the received date.
Partial details of part (i) of condition 7 (Construction Logistics Plans) and part (i) of condition 8 (Construction and Environmental Management Plans), in relation to the demolition and piling mat works at 1 Minerva Road only; Partial details of parts (ii) and (iii) of condition 7 (Construction Logistics Plans) and parts (ii) and (iii) of condition 8 (Construction and Environmental Management Plans), in relation to the installation of the buried pipework along Minerva Road and North Acton Road only; and Partial details of condition 11 (HS2 Safeguarding), in relation to 1 Minerva Road and works along Minerva Road and North Acton Road only; pursuant to planning permission reference 25/0184/FUMOPDC dated 25/03/2026, for 'Development associated with the Old Oak and Park Royal Energy Network (OPEN) district heating network, comprising: Demolition of a warehouse building at 1 Minerva Road, London, NW10 6HJ, and erection of a purposebuilt energy centre building; Laying of a network of underground heat pipes; Erection of a crossover gantry to carry the pipework over existing railway tracks, running parallel to the Park Royal Road Overbridge; and Other associated works.' (Out of Borough)
07 October 2026
08 October 2026
Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.
Open council-hosted application recordCheck public commenting on council portalFind the application on the council portal
Use the available source or council register link above. A register fallback may require you to search for the application reference.
Check whether public comments are accepted
Application types and public commenting eligibility vary. Follow the council's published instructions, including any registration and personal-information requirements.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
Use the published public consultation deadline on the official record. Do not calculate it from the received date or substitute a statutory-consultee date. Ask the council if the deadline or eligibility is unclear.
💡 Tip: A recorded undecided status does not mean comments are accepted. Check the council's current record and meeting rules before taking part.
First tracked by Planning Alerts
Documents remain with London Borough of Ealing. External links open in a new tab.
Choose a postcode and radius in your alert settings. Area alerts depend on available source coverage and checks; this does not activate monitoring for this individual application.
Open alert setupLondon Borough of Ealing
EAL
idox portal
to save applications
Share the recorded details and encourage neighbours to check the current official record.
to add private notes
Community discussion here is not a representation to the council. Use the official record to check public commenting instructions.
to join the discussion
No comments yet. Be the first to share your thoughts.