Recorded as undecided
Recorded source status: Undecided. This is a recorded snapshot, not a current-status guarantee.
Last source check: 12 October 2026. This record has not been checked recently; its status and consultation details may have changed. Check the responsible authority's published record.
No published public consultation end date is recorded. Check the official record for eligibility, publicity dates and whether comments are being accepted. We do not estimate a deadline from the received date.
Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Structures - Provision of a ditch crossing slab around the northern end of Patrick Cutting and Embankment (both consented separately - SMBC planning reference: PL/2025/00285/HS2DIS); earthworks - Engineering earthworks to form the toe of two adjoining embankments; engineering earthworks to form a maintenance access strip (MAS), a maintenance access track (MAT) and associated ford crossing at northern end of the River Blythe Viaduct (consented separately - SMBC planning reference: PL/2024/00540/S17DIS); engineering earthworks to form drainage ditches, including a drainage ditch incorporating a concrete drop-inlet cascade around the northern end of Patrick Cutting and Embankment (both consented separately - planning reference: PL/2025/00285/HS2DIS), extending beneath the southern extent of the River Blythe Viaduct (consented separately - SMBC planning reference: PL/2024/00540/S17DIS); earthworks to create part of a layby, partially consented under Patrick Cutting and Embankment (both consented separately - SMBC reference: PL/2025/00285/HS2DIS); fences and walls - Provision of Vehicle Restraint Systems (VRS), located south of the River Blythe Viaduct (consented separately - SMBC planning reference: PL/2024/00540/S17DIS); provision of boundary and security fencing with access gates.
09 October 2026
12 October 2026
Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.
Open council-hosted application recordCheck public commenting on council portalFind the application on the council portal
Use the available source or council register link above. A register fallback may require you to search for the application reference.
Check whether public comments are accepted
Application types and public commenting eligibility vary. Follow the council's published instructions, including any registration and personal-information requirements.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
Use the published public consultation deadline on the official record. Do not calculate it from the received date or substitute a statutory-consultee date. Ask the council if the deadline or eligibility is unclear.
💡 Tip: A recorded undecided status does not mean comments are accepted. Check the council's current record and meeting rules before taking part.
First tracked by Planning Alerts
Documents remain with Solihull Metropolitan Borough Council. External links open in a new tab.
Choose a postcode and radius in your alert settings. Area alerts depend on available source coverage and checks; this does not activate monitoring for this individual application.
Open alert setupSolihull Metropolitan Borough Council
SOL
idox portal
to save applications
Share the recorded details and encourage neighbours to check the current official record.
to add private notes
Community discussion here is not a representation to the council. Use the official record to check public commenting instructions.
to join the discussion
No comments yet. Be the first to share your thoughts.