Recorded as undecided
Recorded source status: Undecided. This is a recorded snapshot, not a current-status guarantee.
Last source check: 5 August 2026. This record has not been checked recently; its status and consultation details may have changed. Check the responsible authority's published record.
No published public consultation end date is recorded. Check the official record for eligibility, publicity dates and whether comments are being accepted. We do not estimate a deadline from the received date.
Discharge of conditions 7 (Landscape Design Proposals) of application 25/03884/FUL (Change the land use of the area surrounding Bishop Sutton SPS from agricultural to Wessex Water operational land. Extend the existing site boundary by an area of approximately 320m2 to the west. Install features within and in land adjacent to the site extension to include below ground storage tank, access covers, manholes, and below ground pipework associated with the new storage tank, extension of 13m to the existing tanker parking area, roadside control kiosk with dimensions 3.1m L x 0.5m W x 2.1m H on reinforced concrete base slab, relocation of existing generator with dimensions 5m L x 1.5m W x 2.25m H and fuel tank with dimensions 1.6m L x 1m W x 1.5 H, 1.8m high chain-link security fence surrounding the new site boundary, 1.2m high single leaf heavy duty field gate for access to adjacent planting area, temporary removal of a 5m section of hedgerow to increase the size of the existing access into t
21 July 2026
05 August 2026
05 August 2026
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open recorded data source (PlanIt)Check public commenting on council portalFind the application on the council portal
Use the available source or council register link above. A register fallback may require you to search for the application reference.
Check whether public comments are accepted
Application types and public commenting eligibility vary. Follow the council's published instructions, including any registration and personal-information requirements.
Write a material planning consideration
Comments must relate to planning matters β e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
Use the published public consultation deadline on the official record. Do not calculate it from the received date or substitute a statutory-consultee date. Ask the council if the deadline or eligibility is unclear.
π‘ Tip: A recorded undecided status does not mean comments are accepted. Check the council's current record and meeting rules before taking part.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with Bath and North East Somerset Council. External links open in a new tab.
Choose a postcode and radius in your alert settings. Area alerts depend on available source coverage and checks; this does not activate monitoring for this individual application.
Open alert setupBath and North East Somerset Council
BAS
idox portal
to save applications
Share the recorded details and encourage neighbours to check the current official record.
to add private notes
Community discussion here is not a representation to the council. Use the official record to check public commenting instructions.
to join the discussion
No comments yet. Be the first to share your thoughts.