Undecided
This application is awaiting a decision from the council.
Section 73 application to vary conditions 1 (Time Limit), 2 (Approved Plans), 3 (Off-Site Highway Works and Sustainable Transport Improvements), 4 (Biodiversity Net Gain Monitoring Scheme), 7 (Closure of Existing Accesses and Footway Upgrades), 8 (Laffak Road Bridge Shuttle Traffic Signal Scheme), 11 (Tree Works), 12 (Demolition Phase Tree Protection Measures), 13 (Construction Phase Tree Protection Measures), 20 (Land Contamination Investigation and Remediation), 22 (Coal Mining Intrusive Site Investigations and Remediation), 25 (Foul and Surface Water Drainage Scheme), 36 (RAMS Method Statement), 40 (Engineering Details for Laffak Road Realignment), 44 (Construction Phase Local Employment Scheme), 46 (Energy and Sustainability Statement), 49 (Submission of Reserved Matters Time Limits), 50 (Approval of Reserved Matters), 62 (Habitat Management and Monitoring Plan), 63 (Habitat Creation and Enhancement Works), 64 (External Materials), 66 (Outline Development Construction Phase Local Employment Scheme), 67 (Outline Development Operational Phase Local Employment Scheme), 71 (Travel Plan), 72 (Phase II Site Investigation and Risk Assessment), 74 (Coal Mining Site Investigations and Remediation), 76 (Invasive Species Method Statement), 77 (Construction Environmental Management Plan) and 79 (Bin Storage Details) of planning permission P/2025/0194/FUL to permit demolition works prior to the discharge of specified pre-commencement conditions.
28 August 2026
07 August 2026
10 August 2026
WA11 9LG
Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.
Open original application recordComment on this applicationFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
First tracked by Planning Alerts
Consultation closed
Public comment period ended
Documents remain with St Helens Council. External links open in a new tab.
Toggle on to get notified when P/2026/0393/S73 changes status.
St Helens Council
SHN
idox portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.