Undecided
This application is awaiting a decision from the council.
Details of condition 8 (Employment and Training Statement) of R24/0081. (Variation of Condition 1-plans, 14- Surface Water Drainage Scheme, 46- approved detail including drainage and 48- flood risk assessment attached to R21/0985 (Hybrid planning application comprising: Outline application (all matters reserved except for site access from the A5) for the demolition of existing structures and the erection of distribution and industrial buildings (Use Class B2 and B8) including ancillary offices and associated earthworks, infrastructure and landscaping, and highways improvements at Dodwells roundabout; a Full application for the development of a distribution building (Use Class B8), including ancillary offices with associated access, hard standing, parking, and on plot landscaping. The proposals include improvements to the existing railway bridge on the A5 Watling Street including increased height clearance. This is a cross boundary application with Hinckley and Bosworth Borough Council
03 August 2026
21 August 2026
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with Rugby Borough Council. External links open in a new tab.
Toggle on to get notified when R26/0711 changes status.
Rugby Borough Council
RUG
unknown portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.