Undecided
This application is awaiting a decision from the council.
Consultation period ended 12 days ago
The standard 21-day consultation window has passed. Late comments may still be accepted at the council's discretion.
Re-roofing of property DETAILS: * Strip existing roof coverings from both elevations * Select and safely set aside for re-use and clear from site defective Welsh slates * Remove old laths * Remove existing insulation and clear from site. * Clean and treat rafters with timber preservative. * Supply and fix new PVC eaves protection * Supply and fit 300 mm Isolena Premium Sheepwool insulation in loft space * To ensure roof remains ventilated after re-roofing we will supply and fix new Glidevale Protect VP400 breathable underfelt * Supply new treated softwood battens and secure with galvanised nails * Re-slate, supply best quality re-claimed Welsh slates as required and secure with alloy nails * Supply and fix 2 Nature Vent slate vents, positioned slightly below centre of the front and rear elevations to improve airflow * Supply and fix new 240 mm Code 4 lead soakers to abutments * Supply and fix new 240 mm Code 4 lead aprons to chimney stack * All lead to be coated in patination oil to prevent staining of roof * Supply and fix one new breathable chimney cowl * Patch render using sand cement mortar 1:3 mix plus bonding agent * Re-bed ridge tiles and point off on completion using sand cement mortar 1:3 mix plus bonding agent * All debris will be removed and the site left clean and tidy on completion
12 September 2026
11 August 2026
12 August 2026
BD18 4PE
Data source: Idox-hosted council register. The council register destination is shown separately from this data-source label.
Open original application recordComment on this applicationFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
First tracked by Planning Alerts
Consultation closed
Public comment period ended
Documents remain with City of Bradford Metropolitan District Council. External links open in a new tab.
Toggle on to get notified when 26/02783/LBC changes status.
City of Bradford Metropolitan District Council
BRD
idox portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.