Undecided
This application is awaiting a decision from the council.
T2 Ash - Crown lift to 5.2 metres over highway and entrance. - Clear overhead BT line by 1.5 metres. T3 Hornbeam - Crown lift to 5.2 metres over driveway. T5 Ash - Fell to ground level. T12 Silver Maple - Remove split hanging branch. - Reduce 2x lowest primaries by up to 3 metres. - Install 4t dynamic cobra brance between main stems. T13 Silver Maple - Reduce 2x extended limbs over the garden by up to 3 metres. T14 Silver Maple - Reduce extended branches on southern aspect by up to 3 metres. - Crown lift low branches over highway to 5.2 metres. T15 Silver Maple - Reduce extended limbs (2 metres approximately). T16 Silver Maple - Remove hanger over footpath. - Reduce height of northern stem by 2 metres approximately. - Install 4t cobra brace between main stems. - Reduce extended limbs on southern aspect by up to 2 metres. T17 Ash - Fell to ground level. T19 Ash - Fell to ground level. T21 Common Beech - Crown lift to 3 metres over the track. T22 Ash - Crown lift to 3 metres over the tra
07 August 2026
11 August 2026
16 August 2026
BH21 7LX
Data source: PlanIt. The council register destination is shown separately from this data-source label.
Open council register to commentFind the application on the council portal
Use the "View original on council portal" button above to open the official planning register entry for this application.
Click "Make a Comment" or "Comment on this application"
Most council portals have a comment tab or button on the application page. You'll need to provide your name and address — anonymous comments are generally not accepted.
Write a material planning consideration
Comments must relate to planning matters — e.g. impact on neighbours, traffic, parking, design, or the local area. Personal objections (e.g. "I don't like the owner") are not considered. Be specific and factual.
Submit before the consultation deadline
The standard consultation period is 21 days from the application's received date. Late comments may still be accepted at the council's discretion, but are not guaranteed to be considered.
💡 Tip: Even if the consultation period has passed, you can still contact your local councillor or attend the planning committee meeting if the application is referred to committee. Check the council portal for meeting dates.
Application received by council
First tracked by Planning Alerts
Planning documents including site plans, design statements, and supporting reports are held on the council's planning portal.
Documents remain with Dorset Council. External links open in a new tab.
Toggle on to get notified when P/TRC/2026/04189 changes status.
Dorset Council
DST
unknown portal
to save applications
Let your neighbours know about this application before the consultation deadline.
to add private notes
to join the discussion
No comments yet. Be the first to share your thoughts.