Recorded information · verify current details at the official register
Preview record-check dates: 3 Aug 2026 to 6 Aug 2026. A record check is not proof of a complete or successful council-wide collection. A missing recent record is not evidence of no local planning activity.
- Essex County Council · Source status: success · Last successful source check: 22 Oct 2026A successful source check does not establish that every returned record was rechecked or that comments remain open.
ESS/12/20/BTE/NMA6PermittedSource: PlanIt · ESS
Non-material amendment conditions 2 and 62 of ESS/12/20/BTE to normalise the site wide restoration scheme across Site A7 to include the approved restoration details across other areas of Bradwell Quarry approved under ESS/79/20/BTE/NMA2.
Record checked: 3 Aug 2026
ESS/31/24/COL/26/01UndecidedSource: PlanIt · ESS
Details pursuant to condition 26 (Post-Excavation Assessment) of planning permission ref: ESS/31/24/COL (Change of use of agricultural land to a waste management use and construction of a concrete pad to enable the extension of green waste open windrow composting operations, topsoil blending and storage operations, construction of a new surface water attenuation lagoon and perimeter landscaped soil bunds)
Record checked: 3 Aug 2026
ESS/31/24/COL/25/02PermittedSource: PlanIt · ESS
Details pursuant to condition 25 (Written Scheme of Investigation) of planning permission ref: ESS/31/24/COL (Change of use of agricultural land to a waste management use and construction of a concrete pad to enable the extension of green waste open windrow composting operations, topsoil blending and storage operations, construction of a new surface water attenuation lagoon and perimeter landscaped soil bunds)
Record checked: 3 Aug 2026
ESS/12/20/BTE/LA1PermittedSource: PlanIt · ESS
Details pursuant to Schedule 8 para 1.4 (Provision of bat boxes) of Legal Agreement (dated 22 June 2022) associated with ECC Planning Ref. ESS/12/20/BTE. ESS/12/20/BTE permission for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane.”
Record checked: 3 Aug 2026
ESS/12/20/BTE/22/08UndecidedSource: PlanIt · ESS
Details pursuant to condition 22 (Noise monitoring – April 2026) of planning permission ESS/12/20/BTE. ESS/12/20/BTE was for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland)
Record checked: 3 Aug 2026
ESS/39/23/BTE/LA6PermittedSource: PlanIt · ESS
Details pursuant to legal obligation set out in Clause 3.10.3 (Traffic Routing Management Scheme) of Legal Agreement (dated 30 October 2009 as amended) 1 year review of Traffic Routing Management Scheme (ESS/39/23/BTE/LA1) associated with ESS/39/23/BTE. ESS/39/23/BTE is the extant permission (as at 28 July 2026) for the Rivenhall Integrated Waste Management Facility.
Record checked: 4 Aug 2026
CC/BTE/25/26/14/01UndecidedSource: PlanIt · ESS
Details pursuant to Condition 14 (Habitat Management and Monitoring Plan) – CC/BTE/25/26: Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary development
Record checked: 6 Aug 2026
CC/BTE/25/26/BGP1UndecidedSource: PlanIt · ESS
Biodiversity Gain Plan pursuant to permission ref: CC/BTE/25/26 (Erection of a new single-storey building to provide classrooms, a studio and ancillary spaces, including PV Panels, together with an associated outdoor learning area, extended car park, new hard play areas, improved access from Public Footpath No. 61, secure cycle parking, refuse store, ASHPs, and ancillary development)
Record checked: 6 Aug 2026