Tyne and Wear · North East England

Planning applications near Hebburn

Browse 143 tracked planning records within 6.2 miles of Hebburn's approximate centre. This is a nearby view, not a city, district or borough boundary; neighbouring authority records may appear.

Showing 20 records. The official register remains the authority for current decisions and consultation deadlines.

143

Tracked records in this search scope

0

First tracked in the last 7 days · not council receipts

1 Sept 2026

Latest received date in this preview

Tracked records near Hebburn

View all in this search scope

Recorded information · verify current details at the official register

Preview record-check dates: 2 Sept 2026 to 4 Sept 2026. A record check is not proof of a complete or successful council-wide collection. A missing recent record is not evidence of no local planning activity.

  • North Tyneside Council · Source status: error · Last successful source check: 16 Sept 2026Latest source status is not successful; the previous successful source check does not revalidate these records.
26/01229/TPOUndecidedSource: PlanIt · NTY

2 Oakhurst Terrace Benton Newcastle Upon Tyne NE12 9NY

T45 - Elm - Reduce lateral branches at a height of between 4-8m above ground level, by a maximum of 2.0m, to nearest branch/limb union on the northern and eastern side of the canopy. 3.0m where the branches oversail No 3 Oakhurst at neighbours request. Removal of roots under the footpaths of No 2 and No 3 Oakhurst. Station Road No 1 Longbenton TPO 1971

Received: 1 Sept 2026Record checked: 4 Sept 2026
26/01187/TPOUndecidedSource: PlanIt · NTY

5 Lovaine Place North Shields Tyne And Wear NE29 0BW

Garden opposite the property. T3 ( ash) - Remove epicormic growth from the main stem and principal branch framework. Crown-clean the tree, removing dead, dying and broken branches throughout the crown. Crown-lift the rear, Metro-facing side by selectively removing or reducing lower branches to lessen the existing overhang towards the Nexus boundary. The remainder of the crown will thinned by 10% and retained. T44 Sycamore - Crown-thin by approximately 15%, removing selected secondary and tertiary branches evenly throughout the crown. The tree overall height, spread, natural form and balanced appearance will be retained. The light crown thin is proposed to reduce canopy density and improve the penetration of dappled sunlight into the yard while retaining the tree overall size and amenity value. G1 Group of three hawthorns Crown-clean all three trees, removing dead, dying and broken branches throughout their crowns. The overall height, spread and natural form of the trees will be retaine

Received: 17 Aug 2026Record checked: 4 Sept 2026
26/01203/AMENDUndecidedSource: PlanIt · NTY

15 Fairfield Drive Cullercoats Tyne And Wear NE30 3AF

Non Material Amendment of planning approval 26/00401/FULH. Alterations to rooflight positions on rear elevation to accommodate means of escape to first floor bedroom and alterations to window opening sizes to rear to make two outer large openings the same size

Received: 20 Aug 2026Record checked: 4 Sept 2026
26/01215/TPOUndecidedSource: PlanIt · NTY

The Tree House Radstock Place Longbenton Newcastle Upon Tyne NE12 8DD

G1 - T1 - Ash: Signs of Ash dieback but not severe, recommend height reduction of 5-6m, reduce lateral branch pointing north by 7m, south by 5m to balance crown. T2 - Ash: Signs of ash dieback but not severe, recommend crown reduce by 4-5m height inline with T1 and crown reduce East side 3.5m to balance excessive weight over neighbours property. Raise by removing lowest branch East over neighbours. Crown reduce north & South 1.5m to balance crown. The Radstock Place, Longbenton TPO 2020

Received: 26 Aug 2026Record checked: 4 Sept 2026

Map of geocoded preview records

Undecided
Permitted
Refused
Withdrawn
Individual pins
20 of 20 mapped

Only preview records with coordinates are pinned. This map does not draw an authority boundary.

Set a postcode alert near Hebburn

Choose the postcode you want to monitor. This creates a radius-based alert, not a city- or county-boundary alert. Source availability and your account settings determine the updates you receive.

Set up a planning alert

From Hebburn: choose a postcode and radius. This alert covers available records near that postcode, not the whole named locality or council area. Source coverage and check times vary; notifications are not a guarantee of instant delivery.

500m

Planning applications near Hebburn: questions

What planning applications are shown for Hebburn?

The current search returns 143 tracked records within 6.2 miles of Hebburn's approximate centre. This preview shows 20 records. It is a stored subset, not a measure of all applications received by the authority.

How do I check a planning application near Hebburn?

Open a listed record to check its reference, recorded status, dates and source. Use an available official record or register link to verify the latest information. Map pins include only records with coordinates.

Can I comment on a planning application near Hebburn?

Comments are handled by the responsible planning authority. Check its official record for the public consultation deadline and eligibility. An undecided status alone does not mean comments are open.

How do I get planning alerts near Hebburn?

Create an account and choose a postcode, radius and delivery frequency. Alerts depend on available source records and your account allowance; they are not a substitute for checking official consultation deadlines.

Where can I find other planning areas in Tyne and Wear?

Use the Tyne and Wear council and area guide to select another locality. This county grouping is a navigation aid, not a single planning jurisdiction.

Data Sources & Attribution

PlanningData.gov.uk ↗Dataset-specific rights

Government planning data platform. Reuse conditions depend on the dataset and originating source; check the licence and attribution for the record you use.

PlanIt.org.uk ↗Rights review

Planning applications aggregator. A provider's catalogue does not establish Planning Alerts coverage or freshness. Source-specific reuse terms require review.

Planning application information accessed from council portals. Individual councils and portal providers may have separate reuse terms.

Listed buildings and scheduled monuments data via PlanningData.gov.uk.

Portal technology and public availability do not themselves establish a commercial reuse licence. Planning Alerts links to the originating source and applies source-specific rights controls. Coverage and successful-check dates vary by source. Council plans and documents remain subject to their publishers' terms; a public link does not grant reuse permission.